Challenge
A long corridor to transform in one design, with an owner budget that kept shifting.
Solution
Planned the boulevard as one continuous, vehicle-free spine with commercial tenants along its edges, and re-optimized the cost estimate six times, once per budget revision, so the design held together as the budget moved.













